Merveille template

Merveille template

The Kerr family motto is: "Late but in earnest"

  • Home
  • Blogs
    • Barging Summary
    • Barging 2017
    • Barging 2016
    • Barging 2015
    • Barging 2014
    • Barging 2013
    • Barging 2012
    • 2011 Barging Blog
    • 2010 Barging Blog
    • Exploring Europe
    • Pastime to Tasmania- 2009
    • Cruise to New Caledonia- 2007
    • Lord Howe, Vanuatu, Solomons- 2006
  • Photos/Videos
    • Our Photo Gallery
    • Videos
  • Avalon Weather
  • Family
    • James's Baptism
    • Penelope & Dave
    • Mary's Baptism
    • Liz
    • Will
    • Will's Kiribati 2010
    • Grace's Baptism
    • Family Stories
  • Sailing
    • Sailing Articles
    • Getting the washing done!
  • Electronics
    • SRS1 AIS Receiver
    • Solmax Solar Regulator
    • Following not yet written:
    • High efficiency Nav lights
    • Boat Electrical Management System
    • DSC add-on for HF radio
  • Our Pacific Friends
    • Disaster hits Solomons
    • Solomons Friends
    • Vanuatu Friends
    • Lakona Water Music
    • New Caledonia Friends
    • 4 photos from travels
    • Catholic Diocese of Gizo
  • Useful Links
    • Send us a message
    • Surgemail
    • Search
Categories
Archives
Calendar
Subscribe to blog
Unsubscribe from blog
Font size: + –
Print

The Pouilly Tunnel

Barging 2017
Penelope and David Kerr
Thursday, 31 August 2017
1857 Hits
1 Comment

While we were climbing up the locks from St Jean de Losne to Pouilly, we learned that there were water shortages on the Burgundy Canal. We hoped this might mean that the summit level was depressed. However, when we got there, we learned that the level was normal. Maybe we could have requested a lowering of the water level. However, this did not seem the right thing to do with serious water restrictions- letting water out of the summit to make an easier transition for us.IMG 5739

We assembled the heavy wooden beams we constructed in 2015 to assist us in keeping central to the tunnel. These "arms" extend out to 5.65metres width at the stern and the tunnel is 6.00metres wide. So, in theory they keep us within +-17.5cm of the centre. Unfortunately, we touched the tunnel wall twice in the first 334metres- once on each side. The first time was when going from the very bright sunshine of a 35degree day to the relative dark of the tunnel (so that it was not possible to see the waterline for a while) and the second was in trying to get the exact right spot for steering. Boats with a single propellor do not move in a perfect straight line, so you have to steer the bow a little off-centre the whole time. It is ironic that the ends of the "arms" did not touch the walls for the final 3,000metres and only the couple of times in the first 334. The damage proved to be less than in previous years and extended inwards 1.5cm from the edge of the roof. In other words, the "arms" need to be about 2.5cm longer on each side, giving a width of 5.7metres and the necessity to steer within +-15cm for the whole distance. Penelope was exhausted by the end as she sat in the rear seat and relayed the distances of the arms from the tunnel walls to the captain. In fact, the captain was also exhausted.IMG 5740

David would dearly have loved to get through unscathed. We stayed an extra day in order to make some repairs to the damage. Fortunately, we had put off repainting the roof and the sides just in case of mishap. So, the extra work of fixing the scrapes only added about three hours and the painting  happened with the overall painting (now completed).

So here we are in Pouilly, through the tunnel and poised to descend the Burgundy Canal for the last stage of our trip.

 

Best Regards,

Dave and Penny

Nearing the end
Up the Burgundy Canal to Pouilly

About the author

Penelope and David Kerr

Penelope and David Kerr

We are very fortunate in being able to spend summer in Australia then summer again

in Europe. We have six months (approximately) per annum on Anja, which is based in France.

Author's recent posts
More posts from author
Monday, 18 December 2017 THE End!
Sunday, 10 September 2017 Nearing the end
Thursday, 31 August 2017 The Pouilly Tunnel
 

Comments 1

Guest
Guest - Max Nankervis on Thursday, 31 August 2017 09:06
ingenuity

Ingenious. But too bad about those extra missing centimetres! Max

0 Cancel Reply
Ingenious. But too bad about those extra missing centimetres! Max
Cancel Update Comment
Already Registered? Login Here
Guest
Tuesday, 28 March 2023

Captcha Image

© 2023 D Kerr